A New scheme of under frequency load shedding and Islanding operation

dc.contributor.authorBambaravanage, T
dc.contributor.authorRodrigo, WDAS
dc.contributor.authorKumarawadu, SP
dc.contributor.authorLidula, NWA
dc.date.accessioned2018-10-03T23:29:54Z
dc.date.available2018-10-03T23:29:54Z
dc.description.abstractEmergency load shedding (LS) for preventing frequency degradation is an established practice all over the world. The objective of LS is to balance load and generation. This paper presents a technique to develop a reliable LS scheme to prevent black-outs, while maintaining stability in power systems (PSs) with high variability and uncertainty under abnormal conditions. Different techniques are available for implementing LS schemes such as traditional, semi-adaptive and adaptive. The LS scheme proposed in this paper has a sequence and conditions of applications of different LS schemes and islanding strategies. The proposed technique comprises with two Phases. During Phase-I, a LS methodology that was based on traditional & semi adaptive LS schemes was implemented and in Phase-II an adaptive LS scheme was implemented. With this methodology, instead of shedding preset loads, the disturbances are shared among the loads. The effectiveness of the developed scheme was investigated by simulating different abnormal conditions in the power system of Sri Lanka. The tendency for a total PS collapse could be eliminated with the suggested scheme which is sensitive to such factors as generation & demand of the PS dynamically, while maintaining stability in PSs with high variability and uncertainty.en_US
dc.identifier.issuept. Ben_US
dc.identifier.journalAnnual Transactions of IESL, The Institution of Engineers, Sri Lankaen_US
dc.identifier.pgnospp. 290 - 296en_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/13610
dc.identifier.volumevol. 1en_US
dc.identifier.year2013en_US
dc.language.isoenen_US
dc.subjectPower system, Under-frequency Load shedding, Stability, Rate of change of frequency, Islandingen_US
dc.titleA New scheme of under frequency load shedding and Islanding operationen_US
dc.typeArticle-Abstracten_US

Files