Challenges of transcending BIM information from design phase to real time on-site construction phase

dc.contributor.authorWijewickrama, MKCS
dc.contributor.authorJayasena, HS
dc.contributor.authorAriyachandra, MRMF
dc.contributor.editorSandanayake, YG
dc.contributor.editorRamachandra, T
dc.contributor.editorGunatilake, S
dc.date.accessioned2022-03-30T07:10:13Z
dc.date.available2022-03-30T07:10:13Z
dc.date.issued2017-06
dc.description.abstractBuilding Information Modelling (BIM) is a revolutionary paradigm which espouses modernization and innovativeness to the conventional Architecture, Engineering, Construction and Operations (AECO) industry. Successful BIM model is enriched with information which was congregated during design phase and such information should be circulated throughout the project life cycle without disturbing its originality. Nevertheless, when the complete BIM information is transferred to the site office, the on-site personnel are not absorbing the real essence of effective BIM information for on-site construction activities. Improvements in Mobile Computing Technology (MCT) have succeeded in linking this communication gap through forms of electronic pocketbooks, personnel laptops and Personal Digital Assistants (PDA). Even though, there is a greater push from technology, site personnel are not willing to accept it and they still prefer the traditional procedure. This discloses that site personnel are not prepared to practice such technologies due to their nature of Resistance to Change (RTC). Subsequently, the aim of the research is to identify the challenges of transcending BIM information from design phase to real time on-site construction phase. To accomplish the aim, a qualitative research approach was followed, steering semi-structured interviews. The gathered information was analysed rigorously through computer based content analysis. This topical study manifest that, all the recognized resisting factors extensively challenge the transcending of BIM information to the on-site construction phase. Hence, the research has successfully identified the challenges which barricade the transcending of BIM information to real time on-site construction phase.en_US
dc.identifier.citationWijewickrama, M.K.C.S., Jayasena, H.S., & Ariyachandra, M.R.M.F. (2017). Challenges of transcending BIM information from design phase to real time on-site construction phase. In Y.G. Sandanayake, T. Ramachandra & S. Gunatilake (Eds.), What’s new and what’s next in the built environment sustainability agenda? (pp. 114-122). Ceylon Institute of Builders. https://ciobwcs.com/downloads/WCS2017-Proceedings.pdfen_US
dc.identifier.conference6th World Construction Symposium 2017en_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.emailmkcsw.mora@gmail.comen_US
dc.identifier.facultyArchitectureen_US
dc.identifier.pgnospp. 114-122en_US
dc.identifier.placeColomboen_US
dc.identifier.proceedingWhat’s new and what’s next in the built environment sustainability agenda?en_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/17506
dc.language.isoenen_US
dc.publisherCeylon Institute of Buildersen_US
dc.relation.urihttps://ciobwcs.com/downloads/WCS2017-Proceedings.pdfen_US
dc.subjectBuilding information modelling (BIM)en_US
dc.subjectMobile computing technology (MCT)en_US
dc.subjectOn-site constructionen_US
dc.subjectResistance to change (RTC)en_US
dc.titleChallenges of transcending BIM information from design phase to real time on-site construction phaseen_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
CHALLENGES OF TRANSCENDING BIMINFORMATION.pdf
Size:
284.76 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections