Proposal for providing potable water requirements of employee’s housing complex of Puttalam coal power project

dc.contributor.advisorKarunadasa, JP
dc.contributor.authorAbeykoon, ABMT
dc.date.accept2011-10
dc.date.accessioned2014-08-21T12:19:28Z
dc.date.available2014-08-21T12:19:28Z
dc.date.issued2014-08-21
dc.description.abstractThis thesis discusses the study of ground water availability at Karamba in Kalpitiya peninsula and hence supply of potable water requirement to the Employer's Housing Compound (EHC) rather than implementing Reverse Osmosis (RO) system. The specific objectives are, 1. To find out the reliable water source. 2. To supply sufficient and quality water in accordance with the Sri Lankan regulations. 3. How to use earth resistivity theory to predict the availability of ground water. 4. To analysis cost effectiveness ground water usage compared to RO modules. 5. To establish the reliable water supply net work to fulfill demand. The content in Chapter 2 provides the reader with the ground water aquifers in Sri Lanka and geomorphological and hydrogeological distribution patterns mapped for different types of aquifers. The information presented in Chapter 3, describes the fundamentals of the image survey to measure the earth resistivity and made various decisions on geological parameters such as the mineral and fluid content, porosity and degree of water saturation in the rock. Actually, Electrical resistivity surveys have been used for many decades in hydrogeological, mining and geotechnical investigations. As human increases, fresh water demand tended to increase too. The world's water consumption rate is doubling every 20 years. Then, RO process, water is made to pass from the more concentrated one, which is the reverse of the principle of osmosis, is used as new technology in the world but more energy consumed with more capital cost. Chapter 4, 5, 6 & 7 will discuss in more details about RO pants, pump selection, piping and costs analysis. Chapter 8 will explain the conclusion and future needs.en_US
dc.identifier.accno102529en_US
dc.identifier.citationAbeykoon, A.B.M.T. (2011). Proposal for providing potable water requirements of employee’s housing complex of Puttalam coal power project [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/10575
dc.identifier.degreeMaster of Science in Electrical Engineeringen_US
dc.identifier.departmentElectrical Engineeringen_US
dc.identifier.facultyEngineeringen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/10575
dc.language.isoenen_US
dc.subjectMSc in Electrical Engineering
dc.subjectELECTRICAL ENGINEERING - Dissertations
dc.subjectPUMPING PLANTS
dc.subjectWATER SUPPLY
dc.titleProposal for providing potable water requirements of employee’s housing complex of Puttalam coal power projecten_US
dc.typeThesis-Abstracten_US

Files