Stope Productivity Improvement through Application of Cut-and-Fill Mining Method Variant at Bogala Graphite Mines, Sri Lanka

dc.contributor.authorAbeykoon, AGTBB
dc.contributor.authorLanka, KASS
dc.contributor.authorOvitigala, IR
dc.contributor.authorWijerathna, KS
dc.contributor.authorHemalal, PVA
dc.contributor.authorDharmaratne, PGR
dc.date.accessioned2016-08-22T04:05:05Z
dc.date.available2016-08-22T04:05:05Z
dc.date.issued2016-08-22
dc.description.abstractVein graphite mining is more often carried out by underground mining in Sri Lanka due to its mode of occurrence. Bogala underground mine is one of the major graphite mines in the country, where overhand cut-and-fill mining method is used for the extraction of graphite since the ore bodies are steeply dipping, with considerable vertical extent and clear and stable ore boundaries. According to the standard practices at the mine, ectraction is carried out at the stope by blasting of both rock and graphite vein in the exposed face, followed by hand sorting to collect graphite. Blasting the host rock and veins are carried out separately. Waste rock generated is used to fill the lower bench. Simultaneously, stope support is carried out and the working platform prepared. In this practice one cycle extends for four shifts and the research was launched with the objective of improving stope productivity by reducing the cycle time. In the proposed methodology, blasting of the face (graphite vein and rock) was carried out simultaneously resulting in the reduction of cycle time to two shifts. Therefore, in the research carried out, with the proposed alternative stope technique followed by froth flotation relevant performance indicators or parameters of productivity, cost and safety were analysed.en_US
dc.identifier.conferenceProceedings of ERE 2016en_US
dc.identifier.departmentDepartment of Earth Resources Engineeringen_US
dc.identifier.emailhpanagoda54@gmail.comen_US
dc.identifier.facultyEngineeringen_US
dc.identifier.pgnospp. 23-28en_US
dc.identifier.placeColomboen_US
dc.identifier.proceedingProceedings of the ERE 2016 Conference on Earth Resourcesen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/11902
dc.identifier.year2016en_US
dc.language.isoenen_US
dc.subjectBlastingen_US
dc.subjectCost
dc.subjectCycle Time
dc.subjectFroth Flotation
dc.titleStope Productivity Improvement through Application of Cut-and-Fill Mining Method Variant at Bogala Graphite Mines, Sri Lankaen_US
dc.typeConference-Full-texten_US

Files