Identification of significant risk factors of guaranteed maximum price (GMP) contracts

dc.contributor.authorPalihakkara, AD
dc.contributor.authorPerera, BAKS
dc.date.accessioned2021-08-03T04:57:34Z
dc.date.available2021-08-03T04:57:34Z
dc.date.issued2021-07
dc.description.abstractThe construction industry is a risk-prone industry where projects are implemented in a dynamic environment with frequent exposure to various uncertainties. A construction contract is a document that allocates the risks associated with a construction project among the project stakeholders. Guaranteed Maximum Price (GMP) contracts have become popular as a project delivery method because they provide the client with a high degree of cost certainty through a fixed price cap that the contractor cannot exceed. However, most of the GMP projects are risky. Thus, the significant risk factors of GMP projects have to be identified to ensure their successful completion. This study, therefore, aimed to identify and rank the most significant risk factors present in GMP contracts. The study adopted a quantitative approach, which included a Delphi survey conducted in two rounds and a statistical analysis of the survey data. The most significant risk factors associated with GMP contracts were ranked according to their impact on the projects and their probability of occurrence (severity). Poorly defined scope of work and design changes were found to be the most significant risk factors associated with GMP contracts. The other significant risk factors of the projects are related to the scope of work, design, documentation, unfamiliarity with the GMP concept, agreed GMP value, and financial failures of the client and contractor.en_US
dc.identifier.conferenceWorld Construction Symposium - 2021en_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.doihttps://doi.org/10.31705/WCS.2021.30en_US
dc.identifier.emailasha.dulanjalie@gmail.comen_US
dc.identifier.emailkanchana@uom.lken_US
dc.identifier.facultyArchitectureen_US
dc.identifier.pgnos347 -357en_US
dc.identifier.placeSri Lankaen_US
dc.identifier.proceeding9th World Construction Symposium - 2021en_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/16597
dc.identifier.year2021en_US
dc.language.isoenen_US
dc.subjectGuaranteed Maximum Price (GMP) contractsen_US
dc.subjectRisk ranking
dc.subjectSignificant risks
dc.titleIdentification of significant risk factors of guaranteed maximum price (GMP) contractsen_US
dc.typeConference-Abstracten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Identification of significant risk factors of.pdf
Size:
682.8 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections