Computerized optimization of the base width of transmission towers in Sri Lanka

dc.contributor.advisorHettiarachchi, MTP
dc.contributor.advisorBaskaran, K
dc.contributor.authorGaneshwaran, R
dc.date.accept2014
dc.date.accessioned2015-02-22T16:01:01Z
dc.date.available2015-02-22T16:01:01Z
dc.date.issued2015-02-22
dc.description.abstractTransmission line towers were mainly used in electrification works in all over the world. Optimization of base width of the transmission towers becomes necessary in order to reduce the cost and to avoid public objection. The use of narrow width tower becomes essential, as the land value appreciates drastically in Sri Lanka. This research is to design the transmission towers with reduced base width to minimize the coverage land with optimum weight and adequate strength. There were number of models selected with 14.2m base width and analyzed by reducing the width in steps from 1m to 3.2m. For this purpose computerized model analysis software named PLS Tower was used. Accordingly cost analysis was carried out for different steel prices and the cost of land. As per this study Optimum base width of 6.2m was found considering both the land & steel price. When compared with the towers used in Sri Lanka, it was found that the narrow width towers designed from this study showed a considerable amount of saving in cost and favourable impact on environmental issues.en_US
dc.identifier.accno107073en_US
dc.identifier.degreeM.Eng.en_US
dc.identifier.departmentDepartment of Civil Engineeringen_US
dc.identifier.facultyEngineeringen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/10687
dc.language.isoenen_US
dc.subjectCIVIL ENGINEERING - Thesisen_US
dc.subjectSTRUCTURAL ENGINEERING DESIGN - Thesis
dc.subjectTRANSMISSIONS
dc.titleComputerized optimization of the base width of transmission towers in Sri Lankaen_US
dc.typeThesis-Abstracten_US