Methodology to develop a driving cycle for a given mode and traffic corridor; case study for Galle Road, Colombo, Sri Lanka

dc.contributor.authorGamlath, I
dc.contributor.authorFernando, C
dc.contributor.authorGalgamuwa, U
dc.contributor.authorPerera, L
dc.contributor.authorBandara, S
dc.contributor.editorNawagamuwa, U
dc.contributor.editorde Silva, LIN
dc.date.accessioned2022-05-26T03:47:36Z
dc.date.available2022-05-26T03:47:36Z
dc.date.issued2012-12
dc.description.abstractA driving cycle is a speed time profile which represents the driving characteristics of a selected area. This can be of use to both legislative and non legislative purposes such as development of emission inventory, determination of fuel consumption etc. As driving cycles are dependent on the traffic constituents, driver behaviour and road conditions established driving cycles cannot be used in Sri Lanka. Hence the objective of this research is to develop a methodology and to constructa driving cycle(s) which represent given set of conditions in Sri Lanka such that it can be use to establish emission inventory in future. To achieve these objectives, it is necessary to collect and analyse the on road speed-time data on selected routes which will represent the driving patterns of urban or rural conditions. Due to the restriction of time and resources, study was limited to one transport corridor, anurban condition and for light vehicles only. A sample driving cycle was developed based on the data collected on the Galle Road, section from Katubedda to Fort using on board method. Cycle was developed using micro trip based cycle construction and computer application was developed to aid this purpose. In this study we observed average speed 21.37km/h, average running speed 25.78km/h, average acceleration 2.03km/h/s and average deceleration 2.02km/h/s with acceleration, deceleration, cruising and idling proportions of 27.37%, 23.70%, 31.43.6 and 17.49% respectively for selected urban condition. This study would facilitate the further studies on development of driving cycles for other conditions and could be of use for traffic engineering studies development.en_US
dc.identifier.citationGamlath, I., Fernando, C., Galgamuwa, U., Perera, L., & Bandara, S. (2012). Methodology to develop a driving cycle for a given mode and traffic corridor; case study for Galle Road, Colombo, Sri Lanka. In U. Nawagamuwa & N. de Silva (Eds.), Proceedings of the Civil Engineering Research for Industry Symposium 2012 (pp. 45-50). Department of Civil Engineering, University of Moratuwa.en_US
dc.identifier.conferenceCivil Engineering Research for Industry Symposium 2012en_US
dc.identifier.departmentDepartment of Civil Engineeringen_US
dc.identifier.emailbandara@uom.lken_US
dc.identifier.emailimgamalath@gmail.comen_US
dc.identifier.emailchrishenf@gmail.comen_US
dc.identifier.emailnandun8781@gmail.comen_US
dc.identifier.emailperera.loshaka©uom.Iken_US
dc.identifier.facultyEngineeringen_US
dc.identifier.pgnospp. 45-50en_US
dc.identifier.placeKatubeddaen_US
dc.identifier.proceedingProceedings of the Civil Engineering Research for Industry Symposium 2012en_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/17917
dc.identifier.year2012en_US
dc.language.isoenen_US
dc.publisherDepartment of Civil Engineering, University of Moratuwaen_US
dc.subjectDriving cycleen_US
dc.subjectEmissionen_US
dc.subjectOn board methoden_US
dc.subjectmicro tripen_US
dc.subjectcycle constructionen_US
dc.titleMethodology to develop a driving cycle for a given mode and traffic corridor; case study for Galle Road, Colombo, Sri Lankaen_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Methodology.pdf
Size:
1.46 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections