Reducing changeover time in injection molding: a lean approach

dc.contributor.authorChamodya, AKL
dc.contributor.authorSenanayake, LSV
dc.contributor.authorPrabhasha, JMB
dc.contributor.authorPriyantha, PGDG
dc.date.accessioned2025-01-09T07:31:03Z
dc.date.available2025-01-09T07:31:03Z
dc.date.issued2024
dc.description.abstractOverall Equipment Effectiveness (OEE) and production efficiency are two of the measures that influence mold changeover time. In the context of mold changeover time reduction, these two measures are highly influenced in the manufacturing industry. Through this study, the main aim is to reduce the mold changeover time and increase process efficiency with the application of Single-Minute Exchange of Die (SMED), waste analysis, and Eliminate-Combine-Rearrange-Simplify (ECRS). The main focus of this study is to identify and eliminate non-value-adding activities from the changeover process. Therefore, this study had done a time-and-motion study and a process breakdown analysis in order to identify the factors that are critically influenced. While the SMED and waste analysis are dealing with the internal and external setup, ECRS will help to streamline the process by improving efficiency and effectiveness. Therefore, this study will discuss the impact of lean manufacturing tools such as SMED, waste analysis, and ECRS on the process and operational efficiency improvement. Also, it discussed how these tools can be practiced in the industrial context.en_US
dc.identifier.conferenceInternational Conference on Business Researchen_US
dc.identifier.doihttps://doi.org/10.31705/ICBR.2024.30en_US
dc.identifier.emailchamodyaakl.20@uom.lken_US
dc.identifier.facultyBusinessen_US
dc.identifier.pgnospp. 372-384en_US
dc.identifier.placeMoratuwaen_US
dc.identifier.proceeding7th International Conference on Business Research (ICBR 2024)en_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/23117
dc.identifier.year2024en_US
dc.language.isoenen_US
dc.publisherBusiness Research Unit (BRU)en_US
dc.subjectLean Manufacturingen_US
dc.subjectMold Changeoveren_US
dc.subjectProduction Efficiencyen_US
dc.subjectSMEDen_US
dc.subjectTime Reductionen_US
dc.titleReducing changeover time in injection molding: a lean approachen_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
ICBR2024-39.pdf
Size:
718.23 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections