A study of road network development prioritization at Lembata district - east nusa tenggara province, Indonesia

dc.contributor.authorDjakfar, Ludfi
dc.contributor.authorAnwar, M Ruslin
dc.contributor.authorIgnasius A, Gerardus
dc.date.accessioned2018-09-13T21:22:07Z
dc.date.available2018-09-13T21:22:07Z
dc.description.abstractThe objective of the study was to prepare a recommendation on how to set up a road network construction programming in Lembata District, Indonesia given such constraints as budget, types of construction, and so on. There were eight road segments across Lembata District included in the road network under consideration. To achieve the objective, the Analytic Hierarchy Process (AHP) method was applied. The process was initiated by brainstorming factors that may affect the selection and prioritization, called in the AHP analysis criteria. The factors were then evaluated using the Cut Off method to select the most suitable ones. From the analysis it was found that factors strongly influence in the selection were road condition, type of road surface, accessibility, mobility, population density, land use disparity, poverty alleviation program, and construction cost. Using the above criteria, an AHP analysis was then conducted to set up a prioritization recommendation for the road construction sequences. It was found that the construction cost was the most important factor to be considered, followed by land use disparity and road condition.en_US
dc.identifier.conference9th Asia Pacific Conference on Transportation & the Environmenten_US
dc.identifier.departmentDepartment of Civil Engineeringen_US
dc.identifier.doihttps://doi.org/10.31705/APTE.2014.27en_US
dc.identifier.facultyEngineeringen_US
dc.identifier.pgnos294-304en_US
dc.identifier.placeMount Laviniaen_US
dc.identifier.proceedingProceedings of the Asia Pacific Conference on Transportation & the Environmenten_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/13552
dc.identifier.year2014en_US
dc.language.isoenen_US
dc.subjectAnalytic hierarchy process (AHP)en_US
dc.subjectCut off pointen_US
dc.subjectRoad network prioritizationen_US
dc.titleA study of road network development prioritization at Lembata district - east nusa tenggara province, Indonesiaen_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
27.pdf
Size:
450.63 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections