Lean iceberg model for post disaster reconstruction projects

dc.contributor.authorEranga, BAI
dc.contributor.authorRanadew, KATO
dc.contributor.authorRathnasinghe, AP
dc.contributor.authorRajini, PAD
dc.contributor.editorSandanayake, YG
dc.contributor.editorWaidyasekara, KGAS
dc.contributor.editorGunatilake, S
dc.date.accessioned2022-12-29T12:46:45Z
dc.date.available2022-12-29T12:46:45Z
dc.date.issued2022-06-24
dc.description.abstractPost Disaster Reconstruction (PDR) projects are currently facing many issues. The highly demanding construction process of PDR projects that involves a number of different and well-coordinated courses of action can be simplified through integrating lean construction. Hence, Lean Iceberg Model (LIM) implementation for PDR projects will eventually minimise the issues in PDR projects. However, there is lack of research on implementation of lean construction to PDR projects. Therefore, this study aims to develop a framework to minimise PDR issues through LIM. This research adopted interpretivism stance and uses the qualitative survey strategy. Semi-structured interviews were conducted with ten experts, selected based on purposive sampling. The code-based content analysis was used to data analysis, which was supported by NVivo12. The findings of the study revealed that lack of quality, lack of budget and delays as the main issues in PDR projects. The essential part, therefore, was to identify invisible elements which were most of the times neglected rather than the visible elements of LIM. Finally, a framework was developed by systematically mapping the identified PDR issues for both visible and invisible elements of the LIM. In addition, the "LIM for PDR" mobile application has been developed as part of the framework which deals with educating and guiding users on a successful implementation of lean in a PDR project through LIM. The results of this research contribute to overcome the PDR issues which can be derived from the LIM. Hence, industry practitioners can use the outcomes to successfully implement lean in PDR projects.en_US
dc.identifier.conferenceWorld Construction Symposium - 2022en_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.doihttps://doi.org/10.31705/WCS.2022.50en_US
dc.identifier.emailisurue@uom.lken_US
dc.identifier.emailtharushar@uom.lken_US
dc.identifier.emailakilapr1993@gmail.comen_US
dc.identifier.facultyArchitectureen_US
dc.identifier.pgnospp. 625-636en_US
dc.identifier.placeSri Lankaen_US
dc.identifier.proceeding10th World Construction Symposium - 2022en_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/19974
dc.identifier.year2022en_US
dc.language.isoenen_US
dc.publisherCeylon Institute of Builders - Sri Lankaen_US
dc.source.urihttps://ciobwcs.com/2022-papers/en_US
dc.subjectLean Constructionen_US
dc.subjectLean Iceberg Modelen_US
dc.subjectPost Disaster Reconstructionen_US
dc.subjectSri Lankaen_US
dc.titleLean iceberg model for post disaster reconstruction projectsen_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
WCS2022_Proceedings_50.pdf
Size:
1.2 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections