Suitability of ICTAD formula and CIDA price indices to calculate the amount of price escalated in construction projects

dc.contributor.authorJanardana, JAB
dc.contributor.authorSamaraweera, A
dc.contributor.authorJayasena, HS
dc.date.accessioned2021-08-04T06:08:20Z
dc.date.available2021-08-04T06:08:20Z
dc.date.issued2021-07
dc.description.abstractPrice fluctuation is a significant risk factor, in every construction project market. It is unavoidable and difficult to forecast. However, it is often argued that there is a difference between the amount calculated with the CIDA price fluctuation formula method and the actual price fluctuation. Therefore, the aim of this research is to investigate the industry opinion on whether there is a difference between price escalations calculated using the CIDA price fluctuation formula and actual price fluctuation. A qualitative research approach was selected to achieve the aim of this research. Through a broad study of literature, it was identified the most critical factors which affected actual price fluctuation deviation. Meanwhile, semi-structured interviews were carried out to identify the reasons affecting fluctuation difference by analysing the data, which was used, and comparing the opinions given by the interviewees. The data was analysed using context analysis. The results of the research confirm that. there is a difference between the amount of price escalation using the ICTAD price fluctuation formula and the actual being used. The main reason behind this difference is the less accuracy of cost indices. To improve the accuracy of the results of this formula, appropriate data collection using an appreciate sample of contractors in producing price indices is recommended as the main.en_US
dc.identifier.conferenceWorld Construction Symposium - 2021en_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.doihttps://doi.org/10.31705/WCS.2021.44en_US
dc.identifier.emailbihara.j@sliit.lken_US
dc.identifier.emailaparna.samaraweera@unisa.edu.auen_US
dc.identifier.emailsuranga@uom.lken_US
dc.identifier.facultyArchitectureen_US
dc.identifier.pgnos505-515en_US
dc.identifier.placeSri Lankaen_US
dc.identifier.proceeding9th World Construction Symposium - 2021en_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/16621
dc.identifier.year2021en_US
dc.language.isoenen_US
dc.subjectCIDA; Indices; Price fluctuationen_US
dc.titleSuitability of ICTAD formula and CIDA price indices to calculate the amount of price escalated in construction projectsen_US
dc.typeConference-Abstracten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Suitability of ICTAD formula and CIDA price.pdf
Size:
759.01 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections