Computer aider cost modelling at briefng stagelinked to smm

dc.contributor.advisorKodikara, G
dc.contributor.authorDissanayake, A
dc.date.accessioned2011-02-24T07:34:06Z
dc.date.available2011-02-24T07:34:06Z
dc.description.abstractInvolvement of the cost advisers -in the early stage of the building design process (briefing stage) for the forecasting of probable cost of projects is often minimal. The traditional pre tender estimating techniques such as unit method, cost per unit floor area method, cube method, approximate quantities method and the like used to forecast the probable cost of projects are not satisfactory. This bars the cost adviser to make the fullest contribution in the early design stage decisions. The surveys conducted in this research revealed the fact that local design practice with respect to design stage estimating is limited to unit method, cost per unit floor area method and later stage approximate quantities method and elemental cost method. The use of computer facility to automate tasks in local practice is very low. Quantity surveyors in design offices use spreadsheet software for calculations. Use of database software or other programming languages in the process of cost advice was not evidenced. This research is, thus, aimed at establishing a computer aided cost model based on bill of approximate quantities properly linked to Standard Method of Measurement (SMM) with the flexibility in application during briefing, sketch plan and working drawing stages. Being linked to SMM, the proposed model ensures transformation of design and cost data into a BOQ prepared in accordance with SMM. The current practice of using bill of approximate quantities for cost forecasting is limited to later stages of the design process since the method requires design information to work upon. This difficulty has been overcome in the proposed model by incorporating design and cost data libraries with computer manipulation. .. A case study was used to generate quantities, compile historical design data, and provide causal relationships to the model. These data coupled with solution neutral design information were used to develop design data library and cost data library of the model which provide sufficient information to make professional judgements at the briefing stage.
dc.identifier.accno75122en_US
dc.identifier.degreeMscen_US
dc.identifier.departmentDepartment of Civil Engineeringen_US
dc.identifier.facultyEngineeringen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/116
dc.language.isoenen_US
dc.subjectCIVIL ENGINEERING
dc.subjectCONSTRUCTION INDUSTRY-Costs
dc.subjectCOMPUTER AIDED ANALYSIS
dc.subjectSTANDARD METHOD OF MEASUREMENT
dc.titleComputer aider cost modelling at briefng stagelinked to smm
dc.typeThesis-Abstract

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
75122-1.pdf
Size:
377.65 KB
Format:
Adobe Portable Document Format
Description:
Pre-text
Loading...
Thumbnail Image
Name:
75122-2.pdf
Size:
850.75 KB
Format:
Adobe Portable Document Format
Description:
Post-text
No Thumbnail Available
Name:
75122.pdf
Size:
7.39 MB
Format:
Adobe Portable Document Format
Description:
Full-thesis

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.58 KB
Format:
Item-specific license agreed upon to submission
Description: