Engineering solution to minimized delays and safety risk at Dehiwala flyover

dc.contributor.authorYahampath, B
dc.contributor.authorBandara, S
dc.contributor.authorPerera, L
dc.contributor.editorHettiarachchi, MTP
dc.date.accessioned2022-05-26T10:48:55Z
dc.date.available2022-05-26T10:48:55Z
dc.date.issued2014-03
dc.description.abstractTraffic congestion is one of the most imperative problems in almost all countries Flyovers are usually used all over the world to address the traffic congestion, especially at intersections. Advantages of grade separation are; less interruption to traffic flow, higher speed and reduces the scope for accidents. In Sri Lanka also flyovers are used to address the delavs and the safety risk at highly congested intersections. Dehiwala intersection was also replaced by a flyover in order to eliminate the traffic congestion. However, congestion and accident trends have not been reduced yet. There are many factors that contribute to increased congestion levels especially during peak periods and the issues behind the increase in accidents at Dehiwala junction. Engineering solutions based on traffic and highway engineering principles can effectively be used to improve the traffic flow and reduce traffic accidents at this location. Accident data analysis, speed and travel time surveys were used to compare the conditions at present and before construction of the flyover. Moreover vehicle movement pattern, road geometry and adjacent land use activities can be used to evaluate the impact to the Dehiwala flyover. Geometry of the road need to be improved as it will not generate significant speed difference between two adjacent sections as well as not generate bottlenecks at the entrances of the flyover. Stopping of buses within 75m from the junction and vehicle parking within 50m range from the intersection need to be discouraged by using regulatory methods.en_US
dc.identifier.citationYahampath, B., Bandara, S., & Perera, L. (2014). Engineering solution to minimized delays and safety risk at Dehiwala flyover. In M.T.P. Hettiarachchi (Ed.), Proceedings of the Civil Engineering Research Symposium 2014 (pp. 97-104). Department of Civil Engineering, University of Moratuwa.en_US
dc.identifier.conferenceCivil Engineering Research Symposium 2014en_US
dc.identifier.departmentDepartment of Civil Engineeringen_US
dc.identifier.emailbuddhika.bcrox@gmail.comen_US
dc.identifier.emailbandara@uom.lken_US
dc.identifier.emailperera.loshaka@gmail.comen_US
dc.identifier.facultyEngineeringen_US
dc.identifier.pgnospp. 97-104en_US
dc.identifier.placeKatubeddaen_US
dc.identifier.proceedingProceedings of the Civil Engineering Research Symposium 2014en_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/17931
dc.identifier.year2014en_US
dc.language.isoenen_US
dc.publisherDepartment of Civil Engineering, University of Moratuwaen_US
dc.subjectFlyoversen_US
dc.subjectEngineering solutionsen_US
dc.subjectMinimize delaysen_US
dc.subjectSafety risksen_US
dc.subjectAccidentsen_US
dc.titleEngineering solution to minimized delays and safety risk at Dehiwala flyoveren_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Engineering solutions.pdf
Size:
622.17 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections