Browsing by Author "Chan, APC"
Now showing 1 - 2 of 2
- Results Per Page
- Sort Options
- item: Conference-Full-textAnalysis of the anti-corruption strategies in the construction sector of China(Ceylon Institute of Builders, 2014-06) Shan, M; Chan, APC; Le, Y; Hu, Y; Sandanayake, YG; Karunasena, GI; Fernando, NGWhile various anti-corruption strategies (ACSs) have been developed to curb the widespread corruption in the construction sector, effectiveness of these ACSs has seldom been investigated. This study, therefore, aims to identify and evaluate the ACSs being implemented in China. To achieve these objectives, a comprehensive literature review and a two-round Delphi survey of 14 experienced industry experts and academics were conducted. Survey results reveal that the most effective ACS is legal framework, followed by penal sanction, regulations, positive leadership, adequate institutions, transparency, economic sanction, administrative sanction, and education and training. Also, the results show that the effectiveness of raising the wage level as an anti-corruption strategy did not receive a high evaluation by the Delphi panel. Findings of this study can help enhance a better understanding of anticorruption strategies and thus improve a corruption-free environment.
- item: Conference-Full-textComparison of key competences of clients and design-build contractors in the construction market of the people’s republic of China (PRC)(2012-06) Xia, B; Chan, APC; Zuo, J; Xia, B., Chan, A.P.C., & Zuo, J. (2012). In S. Senaratne & Y.G. Sandanayake (Eds.), Global challenges in construction industry (pp. pp. 427-433). Ceylon Institute of Builders. https://ciobwcs.com/downloads/WCS2012-Proceedings.pdf; Senaratne, S; Sandanayake, YGClients and Design-Build (DB) contractors are two key stakeholders in DB projects, and contribute significantly to the successful project performance. This study aims to identify and compare such key competences in the construction market of the PRC. After the survey of available literature and face-toface interviews, a two-round Delphi questionnaire survey was conducted to identify the key competences of clients and DB contractors in DB projects. Relative importance of these identified competences were ranked and compared. The questionnaire results indicated distinct differences between the key competences of clients and that of contractors. The contractor’s key competences emphasise on DB experience, corporate management capability, building and design expertise, financial capability, enterprise qualification and reputation. While the client’s competences focus on the ability to clearly define the project scope and requirements, financial capacity, contract management ability, adequate staff, effective coordination with DB contractor and similar DB experience. Both clients and DB contractors should clearly understand the competence requirements in DB projects and possess all the necessary competences for the successful outcome of DB projects. The identification of these key competences provides clients and DB contractors with indicators to assess their capabilities before going for the DB option. Furthermore, the comparison of competences for clients and DB contractors will result in better understanding of DB system and improve the communication between these stakeholders.